At Eyes on Ukraine, we are constantly looking for ways to deliver better equipment at a lower cost. By developing and testing our own solutions, we can provide Ukraine with reliable equipment while making the most effective use of every euro donated.

Recently, we developed this 5 kWh power station based on a hybrid inverter connected to a LiFePO4 battery. The system combines high charging and discharging power with a large solar input capacity. The total cost of the system is approximately โ‚ฌ900. That is roughly half the cost of a comparable Pecron system and around one-third the cost of a comparable EcoFlow system.

On this page, we explain how the system works, which components we use, and how you can build one yourself. The system consists of a Humsienk 51.2V 100Ah (5.12 kWh) rack mount battery connected to a Datou Boss 6200W rack mount hybrid inverter. During our testing, the Humsienk battery charged from the grid at 2,600 watts / 50A. This is an excellent result, particularly in situations where fast charging is essential.

The hybrid inverter not just charges the battery from the grid but also allows the battery to be charged from solar panels or a generator, making the system a versatile solution for locations where reliable grid power is unavailable.


ะ†ะฝัั‚ั€ัƒะบั†ั–ั ะทั– ัั‚ะฒะพั€ะตะฝะฝั ัะฐะผะพั€ะพะฑะฝะพั— ะทะฐั€ัะดะฝะพั— ัั‚ะฐะฝั†ั–ั—

ะะฐ ะฒั–ะดะตะพ ะฝะธะถั‡ะต ะฟะพะบะฐะทะฐะฝะพ, ัะบ ะฟะตั€ะตะบะปะฐัั‚ะธ ั†ัŽ ัั‚ะพั€ั–ะฝะบัƒ.


The hardware

The inverter comes with 8 brackets. Four of them can be used as spacers between the battery and the inverter and as cable guides. The other four can be used as spacers between the battery and the inverter, to bolt the battery and inverter together, and to screw the mounting board to the inverter.

The photos show how we used the brackets.

The wooden mounting board is screwed to two brackets supplied with the hybrid inverters. This board measures 44 ร— 30 cm.

Datou Boss inverters are also sold under other brand names, including MFUZOP and GRNPVRE. In fact, when ordering a Datou Boss inverter, you may receive one branded differently. Despite the different brand names, the product itself is identical.


Connection materials

Between the battery and the inverter, we use custom-made cables. We chose M6 to M8 ring terminal, 4 AWG, 20 cm, red & M6 to M8 ring terminal, 4 AWG, 40 cm, black. We ordered the cables from this store on AliExpress. The cables supplied with the inverter are too short, and the ring terminals have the wrong diameter.

For the AC charging cable, we chose a cable with 3 ร— 2.5 mmยฒ. We bought the cable on Amazon.

The wall divider is connected to the inverter with a 110cm 3 ร— 4 mmยฒ cable. We bought the cable on Amazon. The wall divider is screwed to the mounting board. We bought the wall divider we used on Amazon.

The PV disconnect switch is connected to the inverter using two 90cm 6 mmยฒ solar cables. We bought the PV disconnect switch on Amazon.

The inverter is attached to the battery using two M4 x 10 mm screws.

Weโ€™ve noticed that Datou Boss inverters are cheaper when purchased directly from the Datou Boss website than through AliExpress. There are up to 12% discount discount codes available for the Datou Boss webshop.

For Humsienk batteries, itโ€™s the other way around: they are cheaper on AliExpress than on the official Humsienk website. Especially when discount codes are used.


How to configure the inverter

This video and the images show the five inverter settings that need to be adjusted.

With these settings, the system will operate as a power station, battery information will be communicated to the inverter, the maximum charging rate will be increased, the battery type will be set, and the minimum state of charge will be lowered.

The manual can be downloaded here.

01 – Enable grid charging

Set the inverter to SBU mode. This allows the battery to be charged from the grid.

05 – Battery type setting

By default, the battery type is set to AGM (lead-acid). We are not certain which setting is technically the best option for this battery. However, we set the battery type to PYL (Pylontech). Pylontech batteries use Lithium Iron Phosphate (LiFePO4) chemistry, making this setting more appropriate for a LiFePO4 battery than the default AGM setting.

11 – Charging current setting

This is where you set the charging current.
When charging from the grid, select 40A, 50A, or 60A, depending on the desired charging speed.
When charging from an inverter generator, check the generatorโ€™s maximum continuous output and select a charging current that keeps the inverterโ€™s power draw slightly below that limit.

37 – Enable BMS communication

By default, communication between the batteryโ€™s BMS (Battery Management System) and the inverter is disabled. Hereโ€™s how to enable it.

If the Datou Boss inverter displays fault code 61 and the LED starts flashing red, this indicates that communication with the Battery Management System (BMS) has been lost.You can try resolving this issue by completely shutting down the battery:

Turn off the battery using both the power switch and the push button.
Wait a few moments.
Turn the battery back on using both controls.

This may restore communication between the inverter and the battery’s BMS.

38 – Set the Bat Soc Under Lock to 5%.

When the battery reaches a State of Charge (SOC) of 5% during discharge, the inverter will shut down to protect the battery. A value below 5% cannot be set.

The default setting is 10% SOC.


Connecting multiple batteries to an inverter

Multiple batteries can be connected to a single inverter, with a maximum of 15 batteries. The image below shows a 10 kWh system consisting of two 5 kWh batteries.

The Battery Management Systems (BMS) of the batteries are connected using a UTP communication cable and configured using the appropriate DIP switch settings. This allows the batteries to communicate and operate together as a single battery bank.

The upper battery is configured as the master, while the lower battery is configured as the slave. Both batteries can be switched on and off using the power switch on the master battery.

When connecting more than two batteries, we recommend using busbars for the DC power connections instead of daisy-chaining the batteries. This ensures better current distribution between the batteries.

This video and image shows how to connect multiple batteries to a single inverter. It explains how to configure the DIP switches correctly and how to connect the UTP communication cables.

The photo shows two batteries connected together. The upper battery is configured as the master, while the lower battery is the slave.

On the master battery, DIP switch 1 is set to ON. On the slave battery, DIP switch 2 is set to ON.

Pay close attention to how the black UTP cable is connected. The connection shown in the photo is the correct configuration. The connection shown in the Humsienk manual is incorrect.

Before connecting multiple batteries together, their voltages must first be equalized. You can do this by charging or discharging one of the batteries until its voltage matches that of the other battery or batteries.

The image below shows a 2,000 W load being supplied by two Humsienk batteries simultaneously. The load is distributed approximately equally between the two batteries.

The first photo below shows the system charging at 3 kW. The second and third photos show how the charging power is distributed between the two batteries.

The first photo below shows the system discharging at 3.8 kW. The second and third photos show how the discharge power is distributed between the two batteries.

Building more powerful power stations

The same basic principles used to build this 5 kWh power station can also be applied to much more powerful systems with significantly greater energy storage capacity and output power. A wide range of hybrid inverters and batteries is available, allowing you to customize a system to meet specific power and capacity requirements. Manufacturers and suppliers of high-capacity batteries include Docan Energy and Humsienk, both offering battery solutions suitable for larger energy storage systems.

The system is not limited to LiFePO4 batteries. Other battery technologies, such as Li-ion and lead-acid batteries (for example, four 12 V batteries connected in series), can also be used.

Building high-capacity power stations using a rack cabinet

Using the same principles described in this guide, you can also build power stations with significantly higher storage capacities. For these larger systems, you can use a Humsienk 3U 4-Layer Rack Cabinet or another suitable rack cabinet to accommodate both the batteries and the hybrid inverter.

The illustration below is an artist’s impression of what such a system could look like.

Tip: Connecting multiple batteries without a busbar

When connecting three batteries you can reduce voltage imbalances by connecting the inverter’s positive and negative battery cables to the middle battery, rather than connecting both cables to the top battery. If both inverter cables are connected to the top battery and the other two batteries are daisy-chained, voltage drops across the cables and connections can cause uneven charging and discharging. As a result, the bottom battery may not charge or discharge as effectively as the others.

Connecting both inverter cables to the middle battery does not guarantee balanced current distribution. For optimal performance, a properly rated busbar system or individual battery cables of equal length and resistance is recommended, especially for high-power applications.


Solar of things app for Datou Boss inverters

With the Solar of Things app for Datou Boss inverters, you can monitor the system and adjust the inverter settings. Datou Boss recommends changing the settings directly on the inverter rather than through the app.

A Datou Boss Wifi dongle is required to use the app.

Download the app here.

Privacy Warning: GPS Location Access

When installing the app, you are required to grant access to your smartphone’s or tablet’s GPS location. If you do not want to risk sharing your location data with the Chinese Communist Party, you have several options:
– Install the app in a remote location, such as an open field, away from your home or other sensitive locations.
– Use GPS spoofing to provide a fake GPS location.
– Do not install the app or use the Wi-Fi dongle at all.

Neither the app nor the Wi-Fi dongle is required to operate the inverter. All essential settings can be configured directly on the inverter itself.


Humsienk app

With the Humsienk app, you can monitor the battery.

Download the app here.


Simultaneous charging and discharging

The power station supports simultaneous charging and discharging, as shown in the Datou Boss app screenshot below.

Important: If the power station is already discharging before the grid, solar panels or a generator is connected, it will not start charging automatically.

To charge and discharge simultaneously, follow these steps:

  1. Connect the power station to the grid, solar panels or a generator to start charging.
  2. The inverter will power on automatically.
  3. Once charging has started, press the inverter’s ON button to enable AC output and begin discharging.

The power station will now charge and discharge simultaneously.


Hybrid inverter idle power consumption

When the inverter is running on battery power and no loads are connected to the inverter, it still consumes 58 W. This can be seen in the Humsienk app. At an idle consumption of 58 W, a fully charged 5 kWh battery would be depleted in approximately 80 hours, even when no devices are connected. One reason for this consumption is that the DC-to-AC inverter remains active whenever the battery is powering the hybrid inverter.
This idle consumption also applies when devices are connected and drawing power. In that case, the inverterโ€™s own consumption is added to the power consumed by the connected devices.

When the hybrid inverter is powered by the grid or a generator and no loads are connected, the DC-to-AC inverter can remain off. In this situation, the idle power consumption is 34 W.

Datou Boss PV8500W wall-mounted hybrid inverter

The wall-mounted Datou Boss PV8500W hybrid inverter has specifications that are very similar to the server rack inverter.
One advantage of this model is that its cooling fans only run when cooling is required. In comparison, the fans in the server rack inverter run continuously. The wall-mounted model is also approximately โ‚ฌ30 cheaper.
One disadvantage is that this inverter cannot be stacked directly with server rack batteries, making it less suitable for building a compact all-in-one system.

The hardware required for the build is otherwise largely the same as for the server rack inverter build. However, a different battery cable is required. We use a 25 mmยฒ / 4 AWG, 100 cm cable with M8 ring terminals. The ring terminals are cut off at one end of the cable for connection to the inverter.

Idle power consumption:

  • Battery-powered: 58 W
  • Grid-connected: 28 W

Issues with Humsienk server rack batteries

An internal inspection of a Humsienk battery by an Will Prowse revealed several concerns regarding manufacturing quality, assembly, and safety.

The following issues were identified:
– One of the balance leads was positioned at a different distance from the battery terminal than the others. Ideally, the balance leads should be installed consistently, with proper placement relative to the temperature sensors.
– A hole was discovered in a weld area, apparently extending into the battery cell itself. This is a serious safety concern because it may compromise the cell’s integrity and potentially cause electrolyte leakage.
– One connection showed visible signs of excessive heat.
– The protective wrapping around one of the battery cells appeared damaged, potentially increasing the risk of an electrical short circuit.
– Several internal components were not properly secured. A fiberboard corner was protruding, and the battery cells lacked adequate lateral compression or restraint, leaving space for movement.
– Although the electrical connections appeared secure and the BMS was properly separated from the cells, the overall internal assembly showed multiple quality-control issues.


Issues with Datou Boss / MFUZOP server rack batteries

We have had poor experiences with Datou Boss / MFUZOP rack-mount batteries. As shown in this video, these batteries charge very slowly. We contacted Datou Boss about the issue, but they were unable to provide a solution.

At a low state of charge, the charging current is limited to approximately 25A. Once the battery reaches around 60% state of charge, the charging current drops even further to just 10A. In our view, these charging speeds are unacceptably low.

We ordered a Datou Boss-branded battery but received an MFUZOP battery instead. Externally, the Datou Boss and MFUZOP rack-mount batteries appear to be identical.

Other Datou Boss battery models, such as floor-standing and wall-mounted batteries, may or may not have the same issue. We have not tested these models, so we cannot confirm whether they are affected.

Packaging and shipping the power station components

The photos below show how we package and ship the power station components.

The hybrid inverter and battery are shipped in their original packaging. For the mounting board and assembly materials, we use a box measuring 430 ร— 350 ร— 200 mm, ensuring that everything is packed as compactly as possible to minimize shipping volume.

The boxes are transported from the Netherlands to Ukraine by vans. Once in Ukraine, they are shipped to their final destinations via Nova Poshta.

We also include a link to this website, allowing recipients to assemble and configure the power station themselves by following the step-by-step instructions provided here.

Battery charging using solar power, grid power, or a generator

In this visualization, the solar panels charge the batteries through the hybrid inverter. If there is insufficient solar energy to fully charge the batteries, but grid power is available, the inverter can use electricity from the grid to complete the charging process. If grid power is unavailable, a generator can be connected to the inverter to supply the additional energy needed to fully charge the batteries.

Video presentation of the power station

Expanding a ready-made power station with a universal 5 kWh battery

An alternative to building your own power station is to expand a ready-made power station with a universal 5 kWh LiFePO4 battery. This approach offers several advantages and disadvantages over a DIY power station based on a hybrid inverter and server rack battery.

Advantages
– Less time is required to build the system.
– Ready-made power stations typically include additional features, such as USB-C Power Delivery (PD) ports.
– The complete system is generally lighter.
– Ready-made power stations typically consume less power when idle, resulting in longer battery runtime.
– Adding a universal 5 kWh battery significantly increases the total energy storage capacity of the power station.

Disadvantages
– Most models use plastic enclosures rather than metal.
– Fewer settings and customization possibilities.
– Solar charging capacity is much lower than that of a hybrid inverter.
– Integrated components and proprietary designs make repairs more challenging.
– The external battery’s Battery Management System (BMS) cannot communicate with the power station. As a result, the power station cannot directly monitor the external battery’s state of charge, temperature, or other BMS data.
– Charging speed is typically 2โ€“3 times lower

Power stations equipped with a 48 V LiFePO4 battery system and an external battery expansion port are suitable for expansion with a universal 5 kWh battery.

For brands such as EcoFlow and Bluetti, ready-made connection cables are available from suppliers such as WattCycle and sellers on AliExpress.

For other brands, it may be possible to create a custom connection cable using the original battery expansion cable.

The general approach is:
– Obtain a compatible battery expansion cable for your power station.
– Cut the cable in half..
– Install a bidirectional DC circuit breaker between the power station and the external battery.
– Connect the external battery using cables fitted with ring terminals.